Over the last 10 years, South East Civil & Crane have completed major infrastructure projects in excess of $8 million.  Our modern fleet of excavation and transportation equipment and skilled personnel has steadily grown over the years.  Our continuing focus on new technology and best industry practice makes South East Civil & Crane the intelligent choice for assisting government departments and regional bodies in achieving their project needs.

Some of these projects are detailed below.


Some of these projects are detailed below:



Demolition of existing infrastructure. Bulk earthworks for 3500m2 carpark.  

Zingel Place road construction. Construction of stormwater infrastructure. Prepare and place landscaped concrete works.

Littleton Gardens Redevelopment

YEAR 2015

Client: RDM for Bega Valley Shire Council

Construction of two new concrete footings. Complete installation of underground conduits. Formation of concrete haunches. Sediment controls and dewatering. Removal and disposal of excess soil. Removal of all redundant cable trenches/conduits. Disposal of site waste.


Kangaroo Valley Substation

YEAR 2015

Client: Zinfra for Transgrid

Construction of new recycling bays. Demolition of existing wall. Bulk earthworks for retaining wall footing. Construction of 45m long x 2m high block wall. Construction of large boulder (1.4m diameter) rock retaining wall. Associated road pavements in preparation for bitumen seal. Variation of pits and pipework in new landfill cell.



Jindabyne Landfill Recycling Bays

YEAR 2015

Client: NSW Public Works / Snowy River Shire Council

Construction of Touched by Olivia Inclusive Play space. Excavation of site, removal and disposal of unsuitable. Subsoil drainage. Construction of over 300m2 footpath. Large rock placement. Management of playground installation and synthetic grass.  

Installation of playground fencing.

Banjo Patterson Park Inclusive Play Space, Jindabyne

Year 2015

Client: Snowy River Shire Council

Drainage Line construction. Containment dams / stormwater lines. Construction of headwalls and pits. Electrical conduit installation.


Cooma 132kv Substation

YEAR 2014

Client: UGL

New sewer manhole construction and repairs to existing Stormwater construction works. 700m of new 2.5m wide footpath and associated concrete works. Installation of new pedestrian lighting along footpath edge.


Jindabyne Sport & Recreation Centre; Civil & landscaping work

YEAR 2014

Client: NSW Public Works for Office of Communities

Install Stormceptor Unit and associated drainage works. Concrete road and carpark construction and dish drains. Bridge deck topping.

Burramys & Perisher Roads Intersection Upgrade, Perisher  

YEAR 2014

Client: Department of Environment & Climate Change NSW - NSW National Park & Wildlife

Road construction either side of new bridge. Creek rehabilitation works. Concrete footpaths and driveways.



Innovation Campus Wollongong

YEAR 2013

Client: Select Civil

Remove existing concrete headwall and construct new cast in situ concrete headwalls over unnamed creek. Construction of coffer dam and by-pass pumping with continual water monitoring of water quality. Water main construction 170m DN100 PN16 UPVC Pipeline. Aqueduct across culverts incl. thermal wrap and mechanical protection. Reinstatement of all water branch lines, fire hydrants and lodge property connections.

Burramys Road Water Main, Perisher

YEAR 2013

Client: Department of Environment & Climate Change NSW - NSW National Park & Wildlife

Excavate and install 70m of DN160 PE100 PN16 SDR11 Blue Stripe Pipeline. Excavate and install 2700m of DN110 PE100 PN16 SDR11 Blue Stripe Pipeline. Install and connect to existing potable water lines. Pressure test, super-chlorinate and commission lines. Remove and replace 20 sewer manholes. Remove and replace approx. 300m of 150mm SN8 RRJ Gravity sewer main. Root cut and treatment of 170m of existing sewer main. Construction of sewer by pass lines to allow normal sewer flows.

Jindabyne Sport & Recreation Centre: Upgrade of Water & Sewer Reticulation (Stage 2)

YEAR 2013

Client: NSW Public Works for Office of Communities

Excavate with chain trencher and install 1km of DN125 PE100 PN16 Pipeline. Underbore under culvert and under bridge. Install and connect to existing potable water lines and trunk main. Pressure test and commission line.

Burrill Lake: Bush Mission Society Water Reticulation  

YEAR 2012

Client: Shoalhaven City Council

Excavate and install 530m of DN160 PE100 PN16 SDR11 Blue Stripe Pipeline. Excavate and install 95m of DN110 PE100 PN16 SDR11 Blue Stripe Pipeline. Install and connect to existing potable water lines. Pressure test, super-chlorinate and commission line. Demolition of existing sewer aqueduct line. Construct, test and commission new sewer aqueduct over Lees Creek.


Jindabyne Sport & Recreation Centre: Upgrade of Water & Sewer Reticulation (Stage1)

YEAR 2012

Client: NSW Public Works for Office of Communities

Construction of Noise Wall. Construction of 13,000m2 shared footpath/cycleway, traffic median infills, hardstands, driveways, etc. Construction of 17m x 50m box culvit incl. footings and placing of crown units. Major creek excavation/construction in highly environmentally sensitive area.

Hoxton Park Road Duplication

YEAR 2011

Client: RTA – Subcontract to Cut and Fill Pty Ltd

Stage 6 - Construction of Utilities trench (incl. water, power, gas and communications subsoil drains). Drainage works / pit construction. Rock Retaining Walls. Concrete roads - 370m (1150m2 concrete) incl. 'SO' dish drain.


NSW Public Works: Perisher Range Roads Stage 6  

YEAR 2011

Client: Kosciuszko National Parks

 

Bulk excavation for pump station. All concrete works incl. pits, pump station retaining walls, footings and roads. Plumbing works for pump station.



Stringy Bark Place Sewerage Pump Station and Rising Main Pipeline, Millingandi

YEAR 2011

Client: TWS – Ted Wilson & Sons Pty Ltd

Construction of entire bridge including anchor footing to rock, construction of abutments, etc. Installation of Rocla M-Lock 12m bridge plank including crane hire.

Big Yard Road - Construction of Bridge

Year 2016

Client: Snowy River Shire Council

Remove and install 3 cell 525mm concrete pipes and encase in concrete. Refit headwall and concrete encase rock armour to outlet of pipes.

Clarke Street - Wolumla Flood Damage Repairs

Year 2016

Client: Bega Valley Shire Council

Emergency Storage tank sloped floor. Concrete hardstand and odour unit base.

Batemans Bay BB13 Sewage Pump Station

YEAR 2016

Client: TWS Pty Ltd for Eurobodalla Shire Council

Construction of Berridale Sewer Main Realignment including service connections. Raising of 35 sewer manholes in Berridale including installation of new Sewer lids. Sewer manhole lid replacement in Adaminaby x 40.

Adaminaby & Berridale Sewer Manhole Replacement and Sewer Main Realignment

YEAR 2016

Client: Snowy River Shire Council

Civil services for laser graded excavation bedding and installation of gravity. Sewer pipe network (700metres) including depths to 5.8metres with shoring boxes. Excavations in pressurised ground water conditions, rock removal processes. Interconnection to directional drilling pipelines. Earthworks for pump station hardstand & tanks

North Yass Industrial Sewage Pump Station & Reticulation

YEAR 2016

Client: TWS Pty Ltd for Yass Valley Council

Installation of over 1000m 150mm Gravity Sewer main at a depth of 900mm – 3.5m. Included 600m of directional drill (Marshnet) of rising main

Entrance road construction. Assisted in pump station construction works. Pump station and emergency storage tank excavations.

Moruya Pump Station

YEAR 2016

Client: TWS Pty Ltd for Eurobodalla Shire Council

Demolition

Detailed excavation and piering for new building

Concrete works including footings, piers caps, lift shaft well and slabs



Albert Moore Gardens Refurbishment - Stage 1 Early Works

YEAR 2016

Client:   Shaw Building Group

Stormwater drainage

All concrete works including disabled access ramps and footpaths

Foundations for overhead structures on bowling greens

Masonry works

Detailed excavation , piering and footings

Sub-grade preparation

Cranage for overhead structure

Club Sapphire Refurbishment

YEAR 2016

Client: Paynter Dixon Constructions Pty Ltd

Infill of western bridge abutment with large rock boulders

Extension of existing concrete wing walls

Mass concrete blocks

Associated concrete works

Abutment Remediation Works - Government Road Bridge, Palestine Creek Eden

YEAR 2016

Client:   Bega Valley Shire Council

Construction of formwork and falsework

Reinforcement steel and suspended slabs

Albert Moore Gardens Refurbishment - Superstructure:  Levels 1 , 2 & 3

YEAR 2017

Client:   Shaw Building Group

Road repairs including excavation, removal of existing road and road restoration.

Supply and installation of gabion units/walls and guardrail.

Guthega Road Culvert Slope Repair

YEAR 2017

Client: Office of Environment & Heritage

All concrete works including formwork and concrete placement of kerb and guttering.

Drain and grate installation.

Perisher Range Road - Concrete Road Works

YEAR 2017

Client:  Office of Environment & Heritage

Installation of concrete precast panels and steel beams.

Detailed Excavation.

Bega Cheese Retaining Wall

YEAR 2017

Client:  Bega Cheese

Removal of existing timber bridge structure, construction of curtain timber wall

Install concrete precast deck, guardrail and signage.

Mitchells Creek Towamba – Bridge Deck Replacement

Year 2017

Client: Bega Valley Shire Council

Excavation works, formwork and installation of concrete driveway laybacks.

Laying asphalt and topsoil.

Bermagui – Installation of Concrete Driveways

Year 2017

Client: Bega Valley Shire Council

Supply and installation of pipes in trenches, stop valves and hydrants.

Excavation works and sealed road repairs, underboring of roads, pathways and footpaths.

Removal of rocks, trees and revegetation, removal and disposal of asbestos pipes.


Mercy Street Bombala – Water Mains Replacement

YEAR 2017

Client: Snowy Monaro Regional Council

Supply and installation of concrete precast bridge components and guardrail.

Excavation works including regrading, reshaping for road surface.

Concrete works including installation of abutments and wingwalls.

Tantangara – Road and Precast Concrete Bridge Construction

YEAR 2017

Client: Office of Environment & Heritage

Detailed excavation works for supply and installation of pits, pipe outlets, concrete pipes with headwall.

Construction of gabion sediment trap, water dissipating ponds.

Shape and compact pavement, and revegetation

Flood Damage Panel – Atkins Anderson Road Bridge Repairs & Nobby Park Road Armco Culvert Rehabilitation

YEAR 2017

Client: Bega Valley Shire Council

Design, construct and install concrete retaining wall panels.

Detailed excavation works for installation of steel beams.

Flood Damage Panel – New Buildings & Mt Darragh Road Embankment Restoration

YEAR 2017


Client: Bega Valley Shire Council

Installation of sediment and traffic control signage


Excavation, formwork and concrete works including construction of reinforced concrete abutment foundation, wall, wingwalls and reinforced concrete piers


Piling works, installation of reinforcing steel and revegetation

Bridge Upgrades – Yowaka Creek Bridge and Murrabrine Creek Bridge

YEAR 2017

Client: Bega Valley Shire Council

Demolition of existing structures and excavation works


Supply and installation of culverts and headwalls


Supply and place pavement material

Snake Track Towamba – Replacement of Two Timber Bridges

YEAR 2017

Client:   Bega Valley Shire Council